A concrete driveway with a view in Dolphin Bay, Tutukaka

Coming to the end of a 1970s home renovation project, this Tutukaka homeowner decided that one of the final areas that needed to be addressed was her property’s driveway. “The driveway was metal, steep and kept washing away, so it was time to concrete”, tells Jason. In collaboration with Platinum Power director Mano Warmington, Jason’s team carried out the 320m2 of groundworks and concreting. The project involved a “complete rebuild”, including setting the base levels and two stages of concreting. “This was a very steep site so the job was split into two stages and a concrete pump was utilised to assist in the placement of the concrete”, explains Jason. “It was an amazing view overlooking Dolphin Bay. It was a pleasure going to work - the crew really enjoyed it and went the extra mile for the client.” While unpredictable weather presented a few unavoidable challenges, the final result was well worth it. Jason’s team put a considerable amount of detail and care into the project, adding attractive embellishments to the site and contouring the driveway to perfection.
Danmark
Tilpas mine indstillinger ved hjælp af cookies

Houzz bruger cookies og lignende teknologier til at tilpasse min oplevelse, give mig relevant indhold og forbedre Houzz-produkter og -tjenester. Ved at klikke på 'Accepter' accepterer jeg dette, som beskrevet yderligere i Houzz-cookiepolitikken. Jeg kan afvise ikke-essentielle cookies ved at klikke på 'Administrer præferencer'.