Bathroom Remodel
2023 Complete bathroom remodel. Time line 14 days.
Things done to the bathroom: Heated floor. Shower and floor surround waterproof. Custom shower pan & bench. Subway tile 3"x12" & 12x24 porcelain tile floor. Glass door and 1/2 wall. Delta shower system. 60" double sink vanity. Kohler toilet. 2 bathroom exhaust fans.
Nice idea for smaller master suite