4 WEEKS!! Master Bathroom Renovation Glendora
In this project we completely gutted the master bathroom and walk in closet. we changed the layout of the shower and toilet and we added free standing tub. the closet had to be enlarged and we frame out new walls with 2 new pocket doors. all the plumbing has been upgraded (working on a concrete slab) running new drain pipes under concrete slab and new cooper pipes and pex pipes in the walls. all the electrical has been upgraded and we added Led recessed lights, switches and dimmers. we installed double sink vanity. free standing tub. toilet. shower head, shower valve and spray diverted. double medicine cabinet and chandelier above the tub.