Holbrook Construction
Holbrook Construction
Gennemsnitlig bedømmelse: 5 ud af 5 stjerner2 anmeldelserVis profil

Large Open Plan Living

Holbrook construction installed a new ground floor block and beam with 150mm fibre reinforced slab with UFH installed within. The ground floor tiles are 800x200 Delconca HFO 5 Fast system. Stainglass windows were then repaired by a specialist stain glass company Ark Stained glass. Holbrook Construction stripped the plaster from the south wall and Sans blasted to leave the exposed brick. Pew was sanded and re-stained in dark oak. 1st floor was installed be Holbrook construction in a traditional RSJ and timber joist method with a suspended ceiling so that all ceilings were the same height. Flush Astro downlights were installed and a modern take on snooker lights by Dar lighting. The Property also benefits from a smart lighting and full home control system by The manufactures Philips Dynalite and RTI. The AV and lighting system was installed by our sister comapny Holbrook engineering. Designed Casi Design

Dette billede har ingen spørgsmål

Har du et spørgsmål til dette billede? Spørg vores community.
Dette kommenterer Houzz-brugere på
Andrew Batchelet tilføjede dette til Basement15. august 2021

Ceiling and brick lights

Danmark
Tilpas mine indstillinger ved hjælp af cookies

Houzz bruger cookies og lignende teknologier til at tilpasse min oplevelse, give mig relevant indhold og forbedre Houzz-produkter og -tjenester. Ved at klikke på 'Accepter' accepterer jeg dette, som beskrevet yderligere i Houzz-cookiepolitikken. Jeg kan afvise ikke-essentielle cookies ved at klikke på 'Administrer præferencer'.